GROUTING REPORT FORM CEMENT in 94 lb BAGS - TRADITIONAL units:
PROJECT CONTRACTOR CONTRACT # SEQUENCE HOLE #
STAGE DEPTH= ft ....TO.. ft.    APPLICATION OF   CLICK AFTER EACH ENTRY TO CONFIRM

         TIME                                      METER READINGS         WATER TESTING BEFORE GROUTING
____ ____PERIOD_______ Cu Ft      WATER TAKE          LUGEONS   DATE Pressure = 15 psi
____ ____= Mins.__ _________= Cu Ft____=
____ ____= ______ _________= ________=     Lugeons        Test behaviour
____ ____= ______ _________= ________= =
GROUTING DETAILS        DATE
                                                 CEMENT             GROUT (Cu Ft)        CEMENT TAKE    PRESSURE
              TIME                            BAGS TO      IN AGITATOR   INJECT-  IN RUN    RATE        (P.S.I)
FROM     TO    PERIOD;    W : C   MIXER      START    FINISH     ED         BAGS  BAGS/MIN                   REMARKS
_ :1 _ _ _ _ _
_ :1 _ _ _ _ _
_ :1 _ _ _ _ _
_ :1 _ _ _ _ _
_ :1 _ _ _ _ _
_ :1 _ _ _ _ _
_ :1 _ _ _ _ _
_ :1 _ _ _ _ _
_ :1 _ _ _ _ _
              TOTAL CEMENT MIXED           TOTAL CEMENT USED - Unpaid waste
                                               TOTAL CEMENT INJECTED Bags (assuming 1 bag = 1 Cu Ft by volume)
    Sheet of              AVERAGE CEMENT TAKE Bags/Ft (= Cu Ft/Ft)